The month of December saw the completion of the external blockwork and the installation of the ceiling joists. We also took delivery of and erected the new radio mast. The building is almost watertight and the next steps are to fit the door and window furniture.
- View of ceiling in gear up room
- View of exit in gear up room
- Partition wall for the control room from the foyer
- View of ceiling joists
- View upstairs
- The garage
- The main entrance
- The control room corner
- The wash down area with mast in background